When the group arrived they were greeted with a clear first floor deck, and when they left the house was almost ready for the second floor deck installation. Walls were constructed down both sides of the house and most of the second floor I-joists we placed.
.jpg)
Additionally the basement stair well was framed in allowing for the 1st floor half bath floor to be installed.