Thursday, May 20, 2010

May 14, 2010

We would like to extend a special thanks to the Manufacturing / Operations group who held a team building event on May 14. This group really found their rhythm and made amazing progress.

When the group arrived they were greeted with a clear first floor deck, and when they left the house was almost ready for the second floor deck installation. Walls were constructed down both sides of the house and most of the second floor I-joists we placed.



Additionally the basement stair well was framed in allowing for the 1st floor half bath floor to be installed.



The Manufacturing / Operations Team