On this Saturday, we handled a variety of jobs including wall framing, laying joists for the third floor, and installing window boxes. The thought of having windows to keep out the cold in future workdays was very motivating, but without being able to access the third floor since the joists and subfloor have not yet been installed, we were unable to get window boxes up there. No windox boxes, means no windows so we will have to wait a little longer it have the houses sealed up from the cold.
Here, the crew works on installing window boxes on 1630:

The crew here installs joists for the third floor:

Framing goes up:

The crew we had Saturday:

Our next workday is January 7th, so we hope to see you there.