The dedication date is fastly approaching, and only a few more workdays are scheduled between now and the March 26th dedication date. Thankfully we had a team build event on Friday where the team installed the upper cabinets in the kitchen. On Saturday we finished the cabinet install by securing the lower cabinets and glueing down the counter top. Due to the great weather, Hirsh, Kurt, and Craig made big strides in getting the railing of the deck finished, and began adding the decorate posts between the main railing posts. A lot of progress was also made in the wood working aspect of the house by creating a bunch of decorative window sills and top caps that are placed on partial walls throughout the house near the stairs. The usual caulking and painting was also taking place, since there is always so much to do in that department. The big projects that still remain are finishing the exposed brick walls throughout the house and adding the bathroom essentials. Great job to the hard working team this week, and we hope to see you at the house soon.
Here is a view of the kitchen with the upper cabinets installed:
Here is a picture of one of the exposed brick walls at the stairway between the first and second floor that will be finished soon with polyurethane. Decorative wood work is visible on the right hand side where the stairs meet the brick.
Finally, here is a photo of the second floor front bedroom that has been painted eggshell.
Monday, March 7, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment