After pumping out the water, we removed the last remnants of the first floor by the front door.
We then began the process of framing the basement. One of the first tasks was to hang a long joist across the side wall and level and secure it. This gave us a reference line to frame to. due to the basement not being completely level, each stud of the basement wall frame had to be cut to fit. It took a while but did manage to get the first frame built and stood up along the wall. A large crew also tackled the task of removing dead shrubbery and trees around the backyard.